Friday, April 28, 2017

April progress

So 30 days in April, and they are almost gone.   What have I completed?

Actually several things:

1) My totally done project was the baby quilt I made for my sister to give away.
Very blue and modern, with some details in the quilting.



2) Finished the Bulls Eye lap quilt.  I am not really happy with the quilting.

3) 9 blocks so far for the Rainbow Scrap Challenge





4) Stash bee blocks: 2  blocks of 9 patch to the 3rd power




5) Blockheads a total of 8 blocks : 5 done done this month including an incredibly complicated pieced 6 in block with 48 pieces,



6  Visited 3 quilt shows: First one in Sun Prairie, WI., 2nd one in Rosemont, IL., and then my local quilt guild in Mukwonago.  Plus the visit to a quilt shop in Wayne, MI.  called Bits and Pieces.

7)  2 Birthdays   Here is the grandson's picture from yesterday.  He was such a good host and friend to the attendees and had so much fun with all the kids.  He had not taken a nap, but fell asleep on the way home at 6:40 never to wake again.
Image may contain: 1 person, sitting, child and table



2 comments:

  1. Hi Debbie,
    I went to the Rosemont quilt show as well. It looks to me like you had a productive month. ~smile~
    Roseanne

    ReplyDelete
  2. You've been quite busy. The 9-patch to the 3rd power blocks are intriguing. They make me want to study them instead of just taking quick glance.

    ReplyDelete